The Principia Machina/Diagrams/11 Work-block lifecycle: Difference between revisions
Appearance
Diagram 11 Work-block lifecycle: source, text equivalent, TPS 0.1.0 addresses |
m 1 revision imported |
(No difference)
| |
Revision as of 19:53, 17 September 2026
Structural diagram 11 of 12. Part of the TPM hub.
- KIND: process
- LANGUAGE: Mermaid state
- GENERATED FROM: per-container schedule log; TPS 5.9.2, 5.9.4
- STATUS: hand-authored at TPS 0.1.0; superseded by TPX at its first build
- SOURCE SHA-256:
5ff7a57986df1a79c2dee9dcffd8428567639333adbc6a23920301570c8c1eef
Rendered live from the source below, which is the text equivalent; if rendering is unavailable the source still stands.
Text equivalent
A block is COMMISSIONED when the lead writes its assignment (5.8.3), OWNED BY its assignee while the local draft carries its block ID (5.9.3), LANDED when its landing is accepted before ETA (5.9.5), and EXPIRED when server time passes ETA (5.9.4). An expired block is recommissioned with a new block ID and a back-pointer, or lands through the post-refusal procedure (5.9.7).