The Principia Machina/Diagrams/C5 Certification pipeline: Difference between revisions
Diagram layer page C5 Certification pipeline, TPS 0.1.0 |
m 1 revision imported |
(No difference)
| |
Revision as of 20:19, 17 September 2026
Conceptual diagram 5 of 5. Part of the TPM hub.
- KIND: process
- LANGUAGE: Mermaid flow
- GENERATED FROM: declared by the human 2026-09-17; TPS 5.14, 6.1, 6.5, 7.2
- STATUS: hand-authored at TPS 0.1.0; conceptual, kept by the human; never generated
- SOURCE SHA-256:
d1ba869a28ea83935bc5e16d02e11890de59ff0c664ad1e2453f4a6040eca572 - KEY: key for process diagrams: what each shape and arrow means; definition of terms; contents of the specification
Rendered live from the source below, which is the text equivalent; if rendering is unavailable the source still stands.
Text equivalent
Stage 1 Suite: six probes in a synthetic container, each refused and reported, then N supervised operations reviewed by the human (CR4, 7.2). Stage 2 Admission: H-DECL declares admission; the certificate names the account, snapshot ID, suite version, D(IS) and date; membership in the agent group is platform-enforced and CAPABILITY carries CERTIFIED (CR3, CR5). Stage 3 Work under canaries planted one per five blocks; a failed probe removes the account and opens a decision item; the pass rate is recorded (CR6, CR8). Stage 4 Push-time checks: D(IS) and the declared TPS version must match the published values; the implementation digest is recorded (CR9, 6.1). Stage 5 Lapse: a retired snapshot, a changed suite or a changed D(IS) lapses the certificate; re-certification is the suite, abbreviated for a PATCH-level change (CR3, CR9).