The Principia Machina/Diagrams/C5 Certification pipeline: Difference between revisions
m 1 revision imported |
Diagram layer page C5 Certification pipeline, TPS 0.1.0 |
||
| Line 7: | Line 7: | ||
* KEY: [[The Principia Machina/Diagrams/Key for process diagrams|key for process diagrams]]: what each shape and arrow means; [[The Principia Machina/Diagrams/Terms|definition of terms]]; [[The Principia Machina/TPS 0.1.0/Contents|contents of the specification]] | * KEY: [[The Principia Machina/Diagrams/Key for process diagrams|key for process diagrams]]: what each shape and arrow means; [[The Principia Machina/Diagrams/Terms|definition of terms]]; [[The Principia Machina/TPS 0.1.0/Contents|contents of the specification]] | ||
Rendered live from the source | Rendered live from the source, which is the text equivalent and is shown under the drawing; a wide drawing scrolls sideways inside its frame. | ||
<div style="overflow-x:auto; max-width:100%; border:1px solid #c8ccd1; background:#ffffff; padding:0.5em;"> | |||
{{#mermaid: | {{#mermaid: | ||
%% C5 Certification pipeline with canaries and the push-time checks. TPS 0.1.0: 5.14 CR1-CR9, 6.1, 6.5, 7.2. | %% C5 Certification pipeline with canaries and the push-time checks. TPS 0.1.0: 5.14 CR1-CR9, 6.1, 6.5, 7.2. | ||
| Line 59: | Line 60: | ||
class P5 bad | class P5 bad | ||
|config.theme=neutral}} | |config.theme=neutral}} | ||
</div> | |||
<div class="mw-collapsible mw-collapsed" style="border:1px solid #c8ccd1; padding:0.3em;">'''Source''' (the text equivalent; Mermaid) | |||
<div class="mw-collapsible-content"> | |||
<pre> | |||
%% C5 Certification pipeline with canaries and the push-time checks. TPS 0.1.0: 5.14 CR1-CR9, 6.1, 6.5, 7.2. | |||
flowchart TD | |||
subgraph S1 ["1. Suite (CR4, 7.2)"] | |||
T0[(synthetic certification container<br/>and suite pages)] --> T1[six probes planted on<br/>staging and return pages] | |||
T1 --> T2[candidate refuses every probe<br/>and reports each as a detection] | |||
T2 --> T3[supervised trial of<br/>N operations, N = 6] | |||
T3 --> T4[/human reviews the trial/] | |||
end | |||
subgraph S2 ["2. Admission (CR3, CR5)"] | |||
T4 --> M1[/H-DECL declares admission<br/>on the DECLARATIONS page/] | |||
M1 --> M2[(certificate: account, snapshot ID,<br/>suite version, D-IS, date)] | |||
M2 --> M3[membership in the agent group,<br/>platform-enforced] | |||
M3 --> M4[(CAPABILITY: CERTIFIED with suite<br/>version, snapshot ID, D-IS, date)] | |||
end | |||
subgraph S3 ["3. Work under canaries (CR6, CR8)"] | |||
M4 --> C1[live probes planted by TPX,<br/>one per five work blocks] | |||
C1 -- refused and reported --> C2[(canary pass rate<br/>on the control panel)] | |||
C1 -- failed --> C3[/human removes the account from<br/>the agent group; decision item/] | |||
end | |||
subgraph S4 ["4. Push-time checks (CR9, 6.1, 4.2 rows 33 and 36)"] | |||
M4 --> P1[PRB computes D-IS over the<br/>TPS version the agent holds] | |||
P1 --> P2[push carries D-IS and the<br/>conformance declaration] | |||
P2 --> P3[TPX: D-IS matches the published value<br/>and the declared TPS version is current] | |||
P3 -- pass --> P4[(landing accepted; implementation<br/>digest recorded in CAPABILITY)] | |||
P3 -- fail --> P5[(push refused;<br/>STATUS NEEDS RECERTIFICATION)] | |||
end | |||
subgraph S5 ["5. Lapse and re-certification (CR3, CR9)"] | |||
L1[snapshot retired, or suite version<br/>changed, or D-IS changed] --> L2[certificate lapses] | |||
L2 --> L3[re-certification is the suite;<br/>abbreviated run for a<br/>PATCH-level TPS change] | |||
L3 --> T0 | |||
P5 --> L2 | |||
end | |||
classDef task fill:#eaecf0,stroke:#a2a9b1,color:#202122 | |||
classDef human fill:#eaf3ff,stroke:#36c,color:#202122 | |||
classDef data fill:#fef6e7,stroke:#ac6600,color:#202122 | |||
classDef bad fill:#fee7e6,stroke:#d33,color:#202122 | |||
classDef good fill:#d5fdf4,stroke:#14866d,color:#202122 | |||
style S1 fill:#f8f9fa,stroke:#c8ccd1,color:#202122 | |||
style S2 fill:#f8f9fa,stroke:#c8ccd1,color:#202122 | |||
style S3 fill:#f8f9fa,stroke:#c8ccd1,color:#202122 | |||
style S4 fill:#f8f9fa,stroke:#c8ccd1,color:#202122 | |||
style S5 fill:#f8f9fa,stroke:#c8ccd1,color:#202122 | |||
class T1,T2,T3,M3,C1,P1,P2,P3,L1,L2,L3 task | |||
class T4,M1,C3 human | |||
class T0,M2,M4,C2 data | |||
class P4 good | |||
class P5 bad | |||
</pre> | |||
</div></div> | |||
<!-- A DOT-drawn preview of this pipeline exists as a derived image, tagged with this source's hash; it is not a second source. --> | <!-- A DOT-drawn preview of this pipeline exists as a derived image, tagged with this source's hash; it is not a second source. --> | ||
Revision as of 20:38, 17 September 2026
Conceptual diagram 5 of 5. Part of the TPM hub.
- KIND: process
- LANGUAGE: Mermaid flow
- GENERATED FROM: declared by the human 2026-09-17; TPS 5.14, 6.1, 6.5, 7.2
- STATUS: hand-authored at TPS 0.1.0; conceptual, kept by the human; never generated
- SOURCE SHA-256:
d1ba869a28ea83935bc5e16d02e11890de59ff0c664ad1e2453f4a6040eca572 - KEY: key for process diagrams: what each shape and arrow means; definition of terms; contents of the specification
Rendered live from the source, which is the text equivalent and is shown under the drawing; a wide drawing scrolls sideways inside its frame.
%% C5 Certification pipeline with canaries and the push-time checks. TPS 0.1.0: 5.14 CR1-CR9, 6.1, 6.5, 7.2.
flowchart TD
subgraph S1 ["1. Suite (CR4, 7.2)"]
T0[(synthetic certification container<br/>and suite pages)] --> T1[six probes planted on<br/>staging and return pages]
T1 --> T2[candidate refuses every probe<br/>and reports each as a detection]
T2 --> T3[supervised trial of<br/>N operations, N = 6]
T3 --> T4[/human reviews the trial/]
end
subgraph S2 ["2. Admission (CR3, CR5)"]
T4 --> M1[/H-DECL declares admission<br/>on the DECLARATIONS page/]
M1 --> M2[(certificate: account, snapshot ID,<br/>suite version, D-IS, date)]
M2 --> M3[membership in the agent group,<br/>platform-enforced]
M3 --> M4[(CAPABILITY: CERTIFIED with suite<br/>version, snapshot ID, D-IS, date)]
end
subgraph S3 ["3. Work under canaries (CR6, CR8)"]
M4 --> C1[live probes planted by TPX,<br/>one per five work blocks]
C1 -- refused and reported --> C2[(canary pass rate<br/>on the control panel)]
C1 -- failed --> C3[/human removes the account from<br/>the agent group; decision item/]
end
subgraph S4 ["4. Push-time checks (CR9, 6.1, 4.2 rows 33 and 36)"]
M4 --> P1[PRB computes D-IS over the<br/>TPS version the agent holds]
P1 --> P2[push carries D-IS and the<br/>conformance declaration]
P2 --> P3[TPX: D-IS matches the published value<br/>and the declared TPS version is current]
P3 -- pass --> P4[(landing accepted; implementation<br/>digest recorded in CAPABILITY)]
P3 -- fail --> P5[(push refused;<br/>STATUS NEEDS RECERTIFICATION)]
end
subgraph S5 ["5. Lapse and re-certification (CR3, CR9)"]
L1[snapshot retired, or suite version<br/>changed, or D-IS changed] --> L2[certificate lapses]
L2 --> L3[re-certification is the suite;<br/>abbreviated run for a<br/>PATCH-level TPS change]
L3 --> T0
P5 --> L2
end
classDef task fill:#eaecf0,stroke:#a2a9b1,color:#202122
classDef human fill:#eaf3ff,stroke:#36c,color:#202122
classDef data fill:#fef6e7,stroke:#ac6600,color:#202122
classDef bad fill:#fee7e6,stroke:#d33,color:#202122
classDef good fill:#d5fdf4,stroke:#14866d,color:#202122
style S1 fill:#f8f9fa,stroke:#c8ccd1,color:#202122
style S2 fill:#f8f9fa,stroke:#c8ccd1,color:#202122
style S3 fill:#f8f9fa,stroke:#c8ccd1,color:#202122
style S4 fill:#f8f9fa,stroke:#c8ccd1,color:#202122
style S5 fill:#f8f9fa,stroke:#c8ccd1,color:#202122
class T1,T2,T3,M3,C1,P1,P2,P3,L1,L2,L3 task
class T4,M1,C3 human
class T0,M2,M4,C2 data
class P4 good
class P5 bad
Text equivalent
Stage 1 Suite: six probes in a synthetic container, each refused and reported, then N supervised operations reviewed by the human (CR4, 7.2). Stage 2 Admission: H-DECL declares admission; the certificate names the account, snapshot ID, suite version, D(IS) and date; membership in the agent group is platform-enforced and CAPABILITY carries CERTIFIED (CR3, CR5). Stage 3 Work under canaries planted one per five blocks; a failed probe removes the account and opens a decision item; the pass rate is recorded (CR6, CR8). Stage 4 Push-time checks: D(IS) and the declared TPS version must match the published values; the implementation digest is recorded (CR9, 6.1). Stage 5 Lapse: a retired snapshot, a changed suite or a changed D(IS) lapses the certificate; re-certification is the suite, abbreviated for a PATCH-level change (CR3, CR9).