Jump to content

Principia Machina/Progress/Status: Difference between revisions

From The Invariance Itself
PMA Progress (talk | contribs)
Progress pages rendered from the Principia Machina source
PMA Progress (talk | contribs)
Progress pages rendered from the Principia Machina source
Line 9: Line 9:
<div class="pma-strip">
<div class="pma-strip">
<div class="pma-strip-head">Master annunciator &middot; lamps judged on 2026-10-17</div>
<div class="pma-strip-head">Master annunciator &middot; lamps judged on 2026-10-17</div>
<div class="pma-tile pma-lamp-amber"><span class="pma-tile-name">Phase 0</span><span class="pma-tile-word">UNDER WAY</span><span class="pma-tile-meta">4 of 5 done</span><span class="pma-tile-meta">likely 2026-10-18</span></div>
<div class="pma-tile pma-lamp-green"><span class="pma-tile-name">Phase 0</span><span class="pma-tile-word">DONE</span><span class="pma-tile-meta">5 of 5 done</span><span class="pma-tile-meta">likely 2026-10-18</span></div>
<div class="pma-tile pma-lamp-amber"><span class="pma-tile-name">Phase 1</span><span class="pma-tile-word">UNDER WAY</span><span class="pma-tile-meta">9 of 14 done</span><span class="pma-tile-meta">likely 2026-10-22</span></div>
<div class="pma-tile pma-lamp-amber"><span class="pma-tile-name">Phase 1</span><span class="pma-tile-word">UNDER WAY</span><span class="pma-tile-meta">9 of 14 done</span><span class="pma-tile-meta">likely 2026-10-22</span></div>
<div class="pma-tile pma-lamp-amber"><span class="pma-tile-name">Phase 2</span><span class="pma-tile-word">UNDER WAY</span><span class="pma-tile-meta">7 of 19 done</span><span class="pma-tile-meta">likely 2026-11-26</span></div>
<div class="pma-tile pma-lamp-amber"><span class="pma-tile-name">Phase 2</span><span class="pma-tile-word">UNDER WAY</span><span class="pma-tile-meta">7 of 19 done</span><span class="pma-tile-meta">likely 2026-11-26</span></div>
Line 25: Line 25:
<div class="pma-panel-wrap">
<div class="pma-panel-wrap">
{| class="pma-panel"
{| class="pma-panel"
|+ [[Principia Machina/Progress/Phase 0|Phase 0]]: The development setup &middot; checked 2026-10-16
|+ [[Principia Machina/Progress/Phase 0|Phase 0]]: The development setup &middot; checked 2026-10-17
! Item !! class="pma-c-state" | State !! class="pma-wide pma-c-owner" | Owner !! class="pma-c-date" | Projected !! class="pma-wide pma-c-date" | Checked
! Item !! class="pma-c-state" | State !! class="pma-wide pma-c-owner" | Owner !! class="pma-c-date" | Projected !! class="pma-wide pma-c-date" | Checked
|-
|-
Line 32: Line 32:
| Check 2: a task started in a cloud session from one machine, then finished and merged from another || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-14
| Check 2: a task started in a cloud session from one machine, then finished and merged from another || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-14
|-
|-
| Check 3: a session served by machine 2, steered from machine 3 and from a phone or tablet || class="pma-lamp pma-lamp-grey" | NOT STARTED || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-15
| Check 3: a session served by machine 2, steered from machine 3 and from a phone or tablet || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-17
|-
|-
| Check 4: a broken proof's error read through the agent's Lean tools in each kind of session || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-16
| Check 4: a broken proof's error read through the agent's Lean tools in each kind of session || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Operator || class="pma-date" | 2026-10-18 || class="pma-wide pma-date" | 2026-10-16
Line 206: Line 206:
   edge [color="#54595d", fontname="Helvetica", fontsize=9, fontcolor="#202122", arrowsize=0.7];
   edge [color="#54595d", fontname="Helvetica", fontsize=9, fontcolor="#202122", arrowsize=0.7];
   node [width=3.6];
   node [width=3.6];
   P0 [label="Phase 0  The development setup\nunder way: the current focus", fillcolor="#cedff2", color="#6a8fbf", penwidth=2.4];
   P0 [label="Phase 0  The development setup\ndone", fillcolor="#cef2e0", color="#14866d"];
   P1 [label="Phase 1  Foundations\nunder way", fillcolor="#cedff2", color="#6a8fbf"];
   P1 [label="Phase 1  Foundations\nunder way: the current focus", fillcolor="#cedff2", color="#6a8fbf", penwidth=2.4];
   P2 [label="Phase 2  The Calculator\nunder way", fillcolor="#cedff2", color="#6a8fbf"];
   P2 [label="Phase 2  The Calculator\nunder way", fillcolor="#cedff2", color="#6a8fbf"];
   P3 [label="Phase 3  Custos\nnot started"];
   P3 [label="Phase 3  Custos\nnot started"];
Line 218: Line 218:
</graphviz>
</graphviz>
</div>
</div>
<div class="pma-caption">'''Figure 7.''' The seven phases, in order, drawn from the status panel: Phases 0 to 2 under way; Phases 3 to 6 not started. The current focus is Phase 0, the lowest phase not done. A phase may begin before the one before it is done. Every state is written in its box; the colours repeat it: green, done; blue, under way; grey, not started; a heavier outline, the current focus.</div>
<div class="pma-caption">'''Figure 7.''' The seven phases, in order, drawn from the status panel: Phase 0 done; Phases 1 and 2 under way; Phases 3 to 6 not started. The current focus is Phase 1, the lowest phase not done. A phase may begin before the one before it is done. Every state is written in its box; the colours repeat it: green, done; blue, under way; grey, not started; a heavier outline, the current focus.</div>


== This panel ==
== This panel ==
Line 225: Line 225:
! Item !! class="pma-c-state" | State !! class="pma-wide pma-c-owner" | Owner !! class="pma-c-date" | Checked
! Item !! class="pma-c-state" | State !! class="pma-wide pma-c-owner" | Owner !! class="pma-c-date" | Checked
|-
|-
| Figure 7 copies current<span class="pma-note">: both copies match this page's</span> || class="pma-lamp pma-lamp-green" | DONE || class="pma-wide" | Declarer || class="pma-date" | 2026-10-17
| Figure 7 copies current<span class="pma-note">: waiting for the next publish: the copy on the Lean transition page and on the Main Page differs</span> || class="pma-lamp pma-lamp-amber" | UNDER WAY || class="pma-wide" | Declarer || class="pma-date" | 2026-10-17
|}
|}
</div>
</div>


as of 2026-10-17
as of 2026-10-17

Revision as of 20:02, 17 October 2026

Principia Machina: map
Reading the program
The move to Lean
Status
Terminology: the words of both versions
Lean itself
Lean theorem prover
Principia Machina in Lean
Version 1
The Principia Machina
its specification

The status panel: every item of every phase as a lamp, from the setup to the first release declared; the aim is every lamp green. Each phase's own page tells its items in words.

DONE PARTIAL n of m UNDER WAY BLOCKED NOT STARTED OVERDUE past its likely date and not done; a panel whose rows under way, partial or blocked are unchecked for more than 2 days is STALE. Every lamp carries its word; the colours repeat it.
Master annunciator · lamps judged on 2026-10-17
Phase 0DONE5 of 5 donelikely 2026-10-18
Phase 1UNDER WAY9 of 14 donelikely 2026-10-22
Phase 2UNDER WAY7 of 19 donelikely 2026-11-26
Phase 3NOT STARTED0 of 8 donelikely 2026-12-13
Phase 4NOT STARTED0 of 6 donelikely 2026-12-20
Phase 5NOT STARTED0 of 6 donelikely 2027-01-03
Phase 6NOT STARTED0 of 4 donelikely 2027-01-13
First releaseNOT STARTED0 of 1 donelikely 2027-01-13

Faults

No faults

The seven phases and the first release

Phase 0: The development setup · checked 2026-10-17
Item State Owner Projected Checked
Check 1: one change builds and passes its tests alike on every machine, in a cloud session and in the automatic checks DONE Operator 2026-10-18 2026-10-16
Check 2: a task started in a cloud session from one machine, then finished and merged from another DONE Operator 2026-10-18 2026-10-14
Check 3: a session served by machine 2, steered from machine 3 and from a phone or tablet DONE Operator 2026-10-18 2026-10-17
Check 4: a broken proof's error read through the agent's Lean tools in each kind of session DONE Operator 2026-10-18 2026-10-16
Check 5: line endings identical when committed from Windows and from Linux DONE Operator 2026-10-18 2026-10-14
Phase 1: Foundations · checked 2026-10-17
Item State Owner Projected Checked
Test T1: a Lean program run on the wiki's host DONE Operator 2026-10-18 2026-10-14
Test T2: one timed call with a 1 MB input, through the wiki's command framework: kit ready, the run on the host owed UNDER WAY Operator 2026-10-18 2026-10-17
Test T3: a hundred calls in one scheduled run, against the hourly budget: kit ready, the run on the host owed UNDER WAY Operator 2026-10-18 2026-10-17
Test T5: a proof checked on the host by an independent Lean kernel checker: kit ready, the run on the host owed UNDER WAY Operator 2026-10-18 2026-10-17
The terminology page, the register of names, on the wiki DONE Declarer 2026-10-18 2026-10-15
The three-letter code table approved DONE Declarer 2026-10-18 2026-10-15
Version 1's material copied into the source repository: six specification texts and the full sources of version 1's server extension and research client wait on the Operator's copy PARTIAL 6 of 8 Operator 2026-10-18 2026-10-17
The declared parameters and tuning options, in Lean DONE Agent 2026-10-18 2026-10-14
The record table as Lean types, with the three forms a derivation may take and the class each earns DONE Agent 2026-10-18 2026-10-14
The terminology map DONE Agent 2026-10-18 2026-10-14
The monthly survey of Lean's toolchain, as a scheduled task that proposes upgrades: set up to run monthly; its first run falls on 2026-10-22 UNDER WAY Agent 2026-10-22 2026-10-17
Publishing the framework's pages from the source, by the Declarer's act DONE Agent 2026-10-18 2026-10-14
The push that keeps the progress pages current, after every landing and once a day DONE Agent 2026-10-18 2026-10-14
The progress pages' wiki account, and their first unattended push DONE Operator 2026-10-18 2026-10-17
Phase 2: The Calculator · checked 2026-10-15
Item State Owner Projected Checked
Digests and canonical serialization DONE Agent 2026-11-26 2026-10-15
Units and dimensions: all seven of version 1's unit functions, with all of its test cases; the Calculator's command for them takes its final form with canonical serialization PARTIAL 7 of 8 Agent 2026-11-26 2026-10-15
The zones: Starting Set, Correspondence Table, Criteria Set DONE Agent 2026-11-26 2026-10-15
Declared forms DONE Agent 2026-11-26 2026-10-15
Fundamental tests and isomorphism checks DONE Agent 2026-11-26 2026-10-15
Records and the register functions: the functions are ported, the record digests computed with SHA-256 as in version 1; the verification's difference waits on the numeric meaning, and the Calculator's command follows PARTIAL 2 of 3 Agent 2026-11-26 2026-10-15
The strike rule, distance, SR8 and SR9: version 1's five test sets pass; its call on the Calculator's command line follows canonical serialization PARTIAL 5 of 6 Agent 2026-11-26 2026-10-15
Hold scope DONE Agent 2026-11-26 2026-10-15
The structure check of the equations of motion: version 1's two test sets pass; its call on the Calculator's command line follows canonical serialization PARTIAL 2 of 3 Agent 2026-11-26 2026-10-15
Provisions: the functions are ported, with the kinds Interaction and Convention, text read in NFC and the digests computed with SHA-256 as in version 1; the Calculator's command for them waits on the Declarer's choice of how it answers a request it cannot judge yet PARTIAL 2 of 3 Agent 2026-11-26 2026-10-15
Probes and their comparison: the functions are ported, all 252 of version 1's test cases computed and agreeing, the draws with SHA-256 and exact numbers; the Calculator's command for probes follows PARTIAL 1 of 2 Agent 2026-11-26 2026-10-15
Score and beta: ported with exact values, all of version 1's test cases passing, the user score's evidence with them now that the sponsor's functions are ported; the Calculator's command for the family follows PARTIAL 2 of 3 Agent 2026-11-26 2026-10-15
Cluster DONE Agent 2026-11-26 2026-10-15
Falcons: the functions are ported, all 949 of version 1's test cases passing, text in NFC and the digests in SHA-256 as in version 1; the Calculator's command follows PARTIAL 3 of 4 Agent 2026-11-26 2026-10-15
Bibliography DONE Agent 2026-11-26 2026-10-15
Identity, sponsor and lint: identity, sponsor and lint are ported, text in NFC and the prompt digest computed with SHA-256 as in version 1; the Calculator's command for them follows PARTIAL 3 of 4 Agent 2026-11-26 2026-10-15
Governor and permissions: the permissions function and the governor's admission; five questions on admission wait on the Declarer; the pressure levels, then the traffic stages, follow PARTIAL 2 of 3 Agent 2026-11-26 2026-10-15
The structured derivation checker, with its soundness proof: the step language, its checker, its credit and the proof that it is sound, with matching a law to an instance of it; which laws may be matched so and what a derivative means wait on the Declarer's choices UNDER WAY Agent 2026-11-26 2026-10-15
The generated specification pages and their converter, shipped with each release NOT STARTED Agent 2026-11-26 2026-10-14
Phase 3: Custos · checked 2026-10-14
Item State Owner Projected Checked
A rehearsal wiki running the host's software, MediaWiki 1.46 on PHP 8.4 NOT STARTED Operator 2026-12-13 2026-10-14
Custos's page classes NOT STARTED Agent 2026-12-13 2026-10-14
Custos's API module NOT STARTED Agent 2026-12-13 2026-10-14
Custos's jobs, run outside the web request NOT STARTED Agent 2026-12-13 2026-10-14
The call into the Calculator, with the binary's digest checked NOT STARTED Agent 2026-12-13 2026-10-14
The governor's meter NOT STARTED Agent 2026-12-13 2026-10-14
The derivation class written at landing, and the kernel checker once test T5 has passed NOT STARTED Agent 2026-12-13 2026-10-14
Version 1's landing scenarios replayed with the Calculator as the only calculator NOT STARTED Agent 2026-12-13 2026-10-14
Phase 4: The Research Client · checked 2026-10-14
Item State Owner Projected Checked
The Research Client in Python, calling the Calculator NOT STARTED Agent 2026-12-20 2026-10-14
The agent-contract bundle, placed by the client NOT STARTED Agent 2026-12-20 2026-10-14
The execution challenge NOT STARTED Agent 2026-12-20 2026-10-14
Retry-After obeyed NOT STARTED Agent 2026-12-20 2026-10-14
The session log NOT STARTED Agent 2026-12-20 2026-10-14
A petition, a push and a release against the rehearsal wiki from machine 2 NOT STARTED Operator 2026-12-20 2026-10-14
Phase 5: Other model families · checked 2026-10-14
Item State Owner Projected Checked
The bootstrap test: each family, given only this wiki's address, reproduces the spring's derivation NOT STARTED Operator 2027-01-03 2026-10-14
The certification suite and the conformance probes, each family in turn NOT STARTED Operator 2027-01-03 2026-10-14
The names check, the digest convention and the execution challenge, from each family's tools NOT STARTED Operator 2027-01-03 2026-10-14
Each vendor's thin implementation, derived from the Agent Contract NOT STARTED Agent 2027-01-03 2026-10-14
The agent-contract bundle's changes declared as a new version NOT STARTED Declarer 2027-01-03 2026-10-14
The walk-through, revised by hand with the new words, readable to each family's reader NOT STARTED Agent 2027-01-03 2026-10-14
Phase 6: Lifecycle and cutover · checked 2026-10-14
Item State Owner Projected Checked
A certified agent's lifecycle on the synthetic UWC, for each certified family NOT STARTED Agent 2027-01-13 2026-10-14
The Calculator and Custos deployed on the host NOT STARTED Operator 2027-01-13 2026-10-14
Version 1's pages left untouched, with a banner pointing forward NOT STARTED Declarer 2027-01-13 2026-10-14
TPM marked historical on its hub NOT STARTED Declarer 2027-01-13 2026-10-14
First release declared · checked 2026-10-14
Item State Owner Projected Checked
The Principia Framework Specification 1.0.0 and the Calculator 1.0.0 declared NOT STARTED Declarer 2027-01-13
2026-12-09 to 2027-03-03
2026-10-14

Figure 7: the phases

Figure 7. The seven phases, in order, drawn from the status panel: Phase 0 done; Phases 1 and 2 under way; Phases 3 to 6 not started. The current focus is Phase 1, the lowest phase not done. A phase may begin before the one before it is done. Every state is written in its box; the colours repeat it: green, done; blue, under way; grey, not started; a heavier outline, the current focus.

This panel

Item State Owner Checked
Figure 7 copies current: waiting for the next publish: the copy on the Lean transition page and on the Main Page differs UNDER WAY Declarer 2026-10-17

as of 2026-10-17