The Principia Machina/Diagrams/11 Work-block lifecycle: Difference between revisions
Appearance
TPM bootstrap: structural diagram 11, Work-block lifecycle |
m 1 revision imported: TPM bootstrap under PMP-TPM 0.2.0 |
(No difference)
| |
Revision as of 06:22, 16 September 2026
Structural diagram 11 of 12. Part of the TPM hub.
- KIND: process
- LANGUAGE: Mermaid state
- GENERATED FROM: per-container schedule log
- STATUS: hand-authored at PMP-TPM 0.2.0 from foundations record 0.5.0 section 4.1; superseded by TPX at its first build (D21, structural diagram pages are TPX output).
The source below is the text equivalent of the diagram. Rendering requires a Mermaid extension; without one the source is shown as text, which 4.1 accepts.
stateDiagram-v2 [*] --> COMMISSIONED : lead commissions block; ETA 1-2 days COMMISSIONED --> OWNED_BY : assigned to wiki account; ASSIGNMENT row; leased range OWNED_BY --> OWNED_BY : draft persists in local instance at each turn boundary OWNED_BY --> LANDED : return vetted under IV; landed by TPX; range reclaimed OWNED_BY --> EXPIRED : server time passes ETA (definitional) COMMISSIONED --> EXPIRED : server time passes ETA EXPIRED --> COMMISSIONED : recommission; new BLOCK ID with back-pointer; partials tagged UNCOMPUTED LANDED --> CORROBORATED : refused late result matches landed result (D13 i) LANDED --> [*] CORROBORATED --> [*]